How Oil And Gas Well is Drilled-Step By Step Guide
- Description
- Curriculum
- FAQ
- Reviews
This Course is very unique the way it carry up detail process of oil and gas well drilling. Course will provide insight for beginner and will add further exposure to experience personnel. This Course include Exploration techniques to explore favorable subsurface petroleum trap, types of trap, trap assessment, predrilling preparation, like drilling program, hiring drilling and other drilling services contractor. Course cover drilling site location preparation, rig move and rig up, rig acceptance process.
In drilling Section it will en-lighten procedure of each section drilling, casing running, cement job operation, well head installation, Pressure testing well head seals and casing slip seal. It Cover every minor step that how conductor pipe is cut, how to nipple down diverter and how to seal off annuls between conductor and surface casing.
Pressure test BOP procedure with test plug and testing well head valve with cup tester. Pressure testing casing. The course is going to cover cement job for casing and liner as well. It will elaborate how to evaluate expected zone potential with Drill Stem Test.
Finally it will help students to understand completion operation sequence, X-mass tree installation procedure and pressure testing X-mass tree.I try to transform all my personal experience and attempt to draw a complete picture of well drilling and completion.
Enroll for this course I guarantee that you will enjoy course contents. This course will boost up your learning curve. Please after taking course leave review. Thanks in advance.
Note: It is recommended to use Desk Top or Labtop for better sound quality.
-
19Drilling Rig Hierarchy
-
20Rig move and Rig up
-
21Rig acceptance process
-
22Phase-1
-
23Weld Neck flange
-
24Nipple UP Diverter
-
25Pressure Test Diverter
-
2617-1/2" Hole Drilling
-
27Run 13-3/8" casing
-
28Cement Job 13-3/8" Casing
-
29Nipple Down Diverter
-
30Weld C Plate
-
31Welding Casing Head Housing
-
32Nipple Up BOP Stack
-
33Pressure Test BOP Stack
-
34Pressure Test Casing Head Housing outlet Valve
-
35Phase-2
-
36Acronym
-
37Symbols
-
38Pressure Test 13-3/8" Casing
-
39Leak Off Test
-
40Drill 12-1/4" BHA
-
41Run 9-5/8" Casing
-
42Cement Job 9-5/8" Casing
-
43Lift BOP stack and Set Casing Slip
-
44ND BOP Stack & Install THS
-
45Nipple UP BOP
-
46Pressure Test BOP Stack
-
47Pressure Test THS outlet Valve
-
48Phase-3
-
49Pressure Test 9-5/8" Casing
-
50Leak Off Test
-
518-1/2" Hole Drilling
-
52Wireline Logging
-
53Run 7" Liner
-
54Set Liner Hanger
-
557" Liner Cementing
-
56PT & Clean 7" liner shoe track
-
577" Liner CBL and VDL wireline Log
-
58Drilling Quiz
Quiz related to Drilling section.